PanelCensus

PGE-INT-131195455

Grass Valley · Nevada County · California · Commercial

System size
505.8 kW
497.5 kW AC
Installed
2025
2025-11-25
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerGreenskies Clean Energy LLCAll their sites →
DeveloperHUNTER ENERGY SOLUTIONS INCAll their sites →
InstallerHUNTER ENERGY SOLUTIONS INCAll their sites →
UtilityPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
modulePowersecure573RSL52931—
moduleCSI Solar Co., Ltd.CS6W-545MB-AG986545.3 W
inverterGinlong Technologies Co., Ltd.S6-GC40K-US [480V] [SI1-SB]239.84 kW
inverterGinlong Technologies Co., Ltd.S6-GC60K-US [480V] [SI1-SB]259.9 kW
inverterGinlong Technologies Co., Ltd.S6-GC50K-US [480V] [SI1-SB]149.85 kW
inverterGinlong Technologies Co., Ltd.S5-GC75K-US [480V] [SI1-SB]174.57 kW
inverterGinlong Technologies Co., Ltd.S5-GC100K-US [480V] [SI1-SB]199.37 kW
inverterGinlong Technologies Co., Ltd.S6-GC25K-US [480V] [SI1-SB]124.89 kW

Site risk

Severe-weather exposure

Solar sites in Nevada County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (30 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-131195455 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-131195455 — solar installation details