PGE-INT-130927961
Clovis · Fresno County · California · Commercial
System size
30.6 kW
29.9 kW AC
Installed
2025
2025-10-10
Price / watt
$5.02/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Evans Energy | All their sites → |
| Installer | Evans Energy | All their sites → |
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SEG Solar Inc. | SEG-460-BMB-TB | 71 | 460.2 W |
| inverter | Enphase Energy Inc. | IQ8P-3P-72-E-US [208V] [SI1-SB] | 71 | 0.47 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-130927961 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.