PGE-INT-130824211
Parlier · Fresno County · California · Commercial
System size
52.1 kW
50.5 kW AC
Installed
2025
2025-03-04
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Sunrun | All their sites → |
| Developer | SUNRUN | All their sites → |
| Installer | Sunrun | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SolarEdge Technologies Ltd. | SE17.3KUS [208V] [SI1-JUN20] | 4 | 16.56 kW |
| inverter | SolarEdge Technologies Ltd. | SE17.3KUS [208V] [SI1-JUN20] | 4 | 16.56 kW |
| inverter | SolarEdge Technologies Ltd. | SE9KUS [208V][SI1-JUN20] | 2 | 8.96 kW |
| inverter | SolarEdge Technologies Ltd. | SE9KUS [208V][SI1-JUN20] | 2 | 8.96 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-130824211 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.