PGE-INT-130803969
Cupertino · Santa Clara County · California · Commercial
System size
46.2 kW
45.1 kW AC
Installed
2025
2025-04-28
Price / watt
$2.97/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Trinity Power | All their sites → |
| Installer | Trinity Solar | All their sites → |
| Utility / operator | Apple, Inc | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | LONGi Green Energy Technology Co., Ltd. | LR5-72HBD-540M | 93 | 540.8 W |
| inverter | Enphase Energy Inc. | IQ8P-3P-72-E-US [208V] [SI1-SB] | 93 | 0.47 kW |
Location: 37.3377, -122.0142 · map
Record cadg_PGE-INT-130803969 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.