PGE-INT-130802836
San Juan Bautista · San Benito County · California · Commercial
System size
178 kW
173.5 kW AC
Installed
2025
2025-05-29
Price / watt
$3.40/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SYNERGY POWER | All their sites → |
| Installer | SYNERGY POWER | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Sol-Ark | L3 HVR-60 | 3 | — |
| module | LONGi Green Energy Technology Co., Ltd. | LR5-72HBD-550M | 351 | 551 W |
| inverter | Sol-Ark | 60K-3P-480V [277V] [SI1-SB] [CTSA035-300A/150mA split core CT] [CRD-PCS NEM] | 3 | 60.05 kW |
Record cadg_PGE-INT-130802836 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.