PanelCensus

PGE-INT-129834782

Ripon · San Joaquin County · California · Commercial

System size
39 kW
38.6 kW AC
Installed
2025
2025-10-23
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleQcells North AmericaQ.PEAK DUO BLK ML-G10+ 410101409.5 W
moduleSolarEdge Technologies Ltd.BAT-10K1P9—
inverterSolarEdge Technologies Ltd.SE11400H-US [240V] [SI1-SB] [CRD-PCS NEM]211.39 kW
inverterSolarEdge Technologies Ltd.SE7600H-US [240V] [SI1-SB] [CRD-PCS NEM]17.62 kW

Site risk

Severe-weather exposure

Solar sites in San Joaquin County have been matched to an average of 1 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (764 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-129834782 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

PGE-INT-129834782 — solar installation details | PanelCensus · PanelCensus