PanelCensus

PGE-INT-129826065

Ripon · San Joaquin County · California · Commercial

System size
47.5 kW
47 kW AC
Installed
2025
2025-10-23
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleSolarEdge Technologies Ltd.BAT-10K1P9—
moduleQcells North AmericaQ.PEAK DUO BLK ML-G10+ 410123409.5 W
inverterSolarEdge Technologies Ltd.SE11400H-US [240V] [SI1-SB] [CRD-PCS NEM]311.39 kW

Site risk

Severe-weather exposure

Solar sites in San Joaquin County have been matched to an average of 1 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (764 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-129826065 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

PGE-INT-129826065 — solar installation details | PanelCensus · PanelCensus