PGE-INT-129621941
Pacifica · San Mateo County · California · Commercial
System size
26.9 kW
26.2 kW AC
Installed
2025
2025-05-21
Price / watt
$4.95/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Wholly Construction Inc | All their sites → |
| Installer | Wholly Construction Inc | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Solar4America Technology Inc. | S4A550-144MH10STT | 52 | 550.6 W |
| inverter | Enphase Energy Inc. | IQ8P-3P-72-E-US [208V] [SI1-SB] | 52 | 0.47 kW |
Site risk
Severe-weather exposure
Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.
Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-129621941 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.