PGE-INT-129034964
Clovis · Fresno County · California · Commercial
System size
69.1 kW
67 kW AC
Installed
2025
2025-08-22
Price / watt
$3.81/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | EMPOWER ELECTRIC SOLAR | All their sites → |
| Installer | EMPOWER ELECTRIC SOLAR | All their sites → |
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Aptos Solar Technology LLC | DNA-144-MF26-440W [Blk] | 171 | 440.3 W |
| inverter | Enphase Energy Inc. | IQ8H-208-72-M-US [208V] [SI1-SB] | 171 | 0.36 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-129034964 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.