PanelCensus

PGE-INT-129025448

Groveland · Tuolumne County · California · Commercial

System size
84.9 kW
83.2 kW AC
Installed
2024
2024-09-20
Price / watt
$2.31/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperGOLD ELECTRIC INCAll their sites →
InstallerGOLD ELECTRIC INCAll their sites →
UtilityPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleQcells North AmericaQ.PEAK DUO XL-G10.c 475192474.4 W
inverterSMA AmericaSTP 30-US-50 [480V] [SI1-SB]230 kW

Site risk

Severe-weather exposure

Solar sites in Tuolumne County have been matched to an average of 2.1 hail and 0.4 high-wind NOAA storm events.

Regional storm exposure by proximity (19 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-129025448 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-129025448 — solar installation details