PanelCensus

PGE-INT-128222922

Morro Bay · San Luis Obispo County · California · Commercial

System size
28.6 kW
27.6 kW AC
Installed
2024
2024-08-09
Price / watt
$3.81/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperELECTRICRAFT INCAll their sites →
InstallerELECTRICRAFT INCAll their sites →
UtilitySan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJinko Solar Co., LtdJKM525M-72HL4-TV58500 W
inverterNorthern Electric & Power Co. LtdBDM-800-240A [240V] [SI1-SB]290.77 kW

Site risk

Severe-weather exposure

Solar sites in San Luis Obispo County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (158 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-128222922 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-128222922 — solar installation details · PanelCensus