PanelCensus

PGE-INT-128193694

Escalon · San Joaquin County · California · Commercial

System size
32.1 kW
31.6 kW AC
Installed
2025
2025-07-24
Price / watt
$3.68/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperMASELLIS ELECTRIC & SOLAR INCAll their sites →
InstallerMASELLIS ELECTRIC & SOLAR INCAll their sites →
Utility / operatorA2B Development LLC dba Mars Energy DevelopmentAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q CELLSQ.PEAK DUO XL-G10.2 48571485.3 W
inverterSolarEdge Technologies Ltd.SE30KUS [480V] [SI1-SB]130.16 kW

Site risk

Severe-weather exposure

Solar sites in San Joaquin County have been matched to an average of 1 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (764 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.8567, -121.0173 · map

Record cadg_PGE-INT-128193694 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-128193694 — solar installation details | PanelCensus · PanelCensus