PGE-INT-127731330
Clovis · Fresno County · California · Commercial
System size
98.9 kW
97 kW AC
Installed
2025
2025-01-29
Price / watt
$1.67/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BARRIER SOLAR INC | All their sites → |
| Installer | BARRIER SOLAR INC | All their sites → |
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SolarEdge Technologies Ltd. | SE5000H-US [240V][SI1-JUN20] | 8 | 5.05 kW |
| inverter | SMA America | STP 20-US-50 [480V] [SI1-SB] | 2 | 20 kW |
| inverter | SMA America | STP 30-US-50 [480V] [SI1-SB] | 1 | 30 kW |
| inverter | SMA America | STP 30-US-50 [480V] [SI1-SB] | 1 | 30 kW |
| inverter | SMA America | STP 20-US-50 [480V] [SI1-SB] | 2 | 20 kW |
| inverter | SolarEdge Technologies Ltd. | SE5000H-US [240V][SI1-JUN20] | 8 | 5.05 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-127731330 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.