PanelCensus

PGE-INT-127729467

Clovis · Fresno County · California · Commercial

System size
197.8 kW
189 kW AC
Installed
2025
2025-03-13
Price / watt
$1.04/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTurnKey EnergyAll their sites →
InstallerTurnKey EnergyAll their sites →
Utility / operatorTesla Inc.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleLONGi Green Energy Technology Co., Ltd.LR5-72HBD-545M394545.1 W
inverterYotta Energy, IncDPI-480 [480V] [SI1-SB]991.82 kW

Site risk

Severe-weather exposure

Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.

Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-127729467 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-127729467 — solar installation details | PanelCensus · PanelCensus