PGE-INT-127211356
Aptos · Santa Cruz County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Sunrun | All their sites → |
| Developer | SUNRUN | All their sites → |
| Installer | Sunrun | All their sites → |
| Utility / operator | Forefront Power, LLC | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO BLK ML-G10+ 405 | 75 | 405 W |
| inverter | SolarEdge Technologies Ltd. | SE7600H-US [240V] [SI1-SB] [CRD-PCS NEM] | 3 | 7.62 kW |
Site risk
Severe-weather exposure
Solar sites in Santa Cruz County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (216 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 36.9883, -121.9250 · map
Record cadg_PGE-INT-127211356 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.