PGE-INT-126978813
Hayward · Alameda County · California · Commercial
System size
27.1 kW
26.8 kW AC
Installed
2025
2025-03-24
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Sunrun | All their sites → |
| Developer | SUNRUN | All their sites → |
| Installer | Sunrun | All their sites → |
| Utility / operator | City of Hayward | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO BLK ML-G10+ 405 | 72 | 405 W |
| inverter | SolarEdge Technologies Ltd. | SE10000H-US [240V] [SI1-SB] | 1 | 9.99 kW |
| inverter | SolarEdge Technologies Ltd. | SE6000H-US [240V] [SI1-SB] | 1 | 6.05 kW |
| inverter | SolarEdge Technologies Ltd. | SE5000H-US [240V] [SI1-SB] | 1 | 5.05 kW |
Location: 37.6334, -122.1318 · map
Record cadg_PGE-INT-126978813 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.