PGE-INT-126387492
Merced County · California · Commercial
System size
108.4 kW
106.3 kW AC
Installed
2025
2025-07-31
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | NEWGEN ENERGY | All their sites → |
| Installer | NEWGEN ENERGY | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Vietnam Sunergy Joint Stock Company | VSUN540-144BMH-DG | 215 | 540.8 W |
| inverter | Chint Power Systems America | CPS SCH100KTL-DO/US-480 [480V] [SI1-SB] | 1 | 100 kW |
Site risk
Severe-weather exposure
Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-126387492 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.