PGE-INT-126377761
Clovis · Fresno County · California · Commercial
System size
135.5 kW
129.8 kW AC
Installed
2023
2023-06-22
Price / watt
$3.45/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Utility / operator | Tesla Inc. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | Advanced Energy Industries | AE 50TX-208 (208V) | 2 | — |
| inverter | Advanced Energy Industries | AE 100TX-208 (208V) | 2 | — |
| inverter | Advanced Energy Industries | AE 100TX-208 (208V) | 2 | — |
| inverter | Advanced Energy Industries | AE 50TX-208 (208V) | 2 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-126377761 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.