PanelCensus

PGE-INT-125926164

Chowchilla · Madera County · California · Commercial

System size
181.1 kW
178.5 kW AC
Installed
2024
2024-06-27
Price / watt
$2.48/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHYUNDAI ENERGY SOLUTIONS CO., LTD.HiA-S370HI528370.3 W
inverterGinlong Technologies Co., Ltd.Solis-100K-5G-US [480V] [SI1-JUN20]1100 kW
inverterGinlong Technologies Co., Ltd.Solis-60K-US-F-LSW [480V] [SI1-JUN20]159.93 kW

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125926164 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125926164 — solar installation details | PanelCensus · PanelCensus