PGE-INT-125926164
Chowchilla · Madera County · California · Commercial
System size
181.1 kW
178.5 kW AC
Installed
2024
2024-06-27
Price / watt
$2.48/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | 1ST LIGHT ENERGY INC | All their sites → |
| Installer | 1ST LIGHT ENERGY INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | HYUNDAI ENERGY SOLUTIONS CO., LTD. | HiA-S370HI | 528 | 370.3 W |
| inverter | Ginlong Technologies Co., Ltd. | Solis-100K-5G-US [480V] [SI1-JUN20] | 1 | 100 kW |
| inverter | Ginlong Technologies Co., Ltd. | Solis-60K-US-F-LSW [480V] [SI1-JUN20] | 1 | 59.93 kW |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125926164 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.