PanelCensus

PGE-INT-125912934

Woodlake · Tulare County · California · Commercial

System size
118.6 kW
115.6 kW AC
Installed
2025
2025-06-30
Price / watt
$2.26/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJA SolarJAM72D30-540/MB234539.6 W
inverterChint Power Systems AmericaCPS SCA36KTL-DO/US-480 [480V] [SI1-SB]336 kW

Site risk

Severe-weather exposure

Solar sites in Tulare County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (448 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125912934 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.