PGE-INT-125903102
Placerville · El Dorado County · California · Commercial
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Installer | TURNKEY CONSTRUCTION AND SOLAR INC | All their sites → |
| Utility / operator | SkyHigh 2 Solar | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO L-G8.2 425 | 222 | 425.2 W |
| inverter | SMA America | STP 20-US-50 [480V] [SI1-SB] | 1 | 20 kW |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-JUN20] | 1 | — |
Site risk
Severe-weather exposure
Solar sites in El Dorado County have been matched to an average of 1.5 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (149 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Location: 38.6993, -120.8286 · map
Record cadg_PGE-INT-125903102 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.