PanelCensus

PGE-INT-125902241

Madera · Madera County · California · Commercial

System size
103.2 kW
101.6 kW AC
Installed
2024
2024-07-02
Price / watt
$2.21/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperTURNKEY CONSTRUCTION AND SOLAR INCAll their sites →
InstallerTURNKEY CONSTRUCTION AND SOLAR INCAll their sites →
UtilitySouthern California Edison Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJinko Solar Co., LtdJKM390M-72HL-V285390 W
inverterChint Power Systems AmericaCPS SCA50KTL-DO/US-480 [480V] [SI1-SB]250 kW

Site risk

Severe-weather exposure

Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125902241 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125902241 — solar installation details