PGE-INT-125899300
Chowchilla · Madera County · California · Commercial
System size
152.5 kW
148.7 kW AC
Installed
2025
2025-05-10
Price / watt
$3.02/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BARRIER SOLAR INC | All their sites → |
| Installer | BARRIER SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Trina Solar | TSM-485DE15V(II) | 336 | 485.2 W |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 2 | — |
| inverter | SMA America | STP 30-US-50 [480V] [SI1-SB] | 1 | 30 kW |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125899300 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.