PGE-INT-125875903
Anderson · Shasta County · California · Commercial
System size
161.1 kW
156.9 kW AC
Installed
2024
2024-09-16
Price / watt
$0.06/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | ALTERNATIVE ENERGY SYSTEMS INC | All their sites → |
| Installer | ALTERNATIVE ENERGY SYSTEMS INC | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO XL-G10.3/BFG 480 | 358 | 479.7 W |
| inverter | SMA America | STP 62-US-41 [480V] [SI1-SB] | 3 | — |
Site risk
Severe-weather exposure
Solar sites in Shasta County have been matched to an average of 1.8 hail (1 severe) and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (65 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125875903 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.