PGE-INT-125851290
Westley · Stanislaus County · California · Commercial
System size
344.7 kW
338 kW AC
Installed
2025
2025-11-19
Price / watt
—
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Owner | Mid Valley Power | All their sites → |
| Developer | MID VALLEY POWER | All their sites → |
| Installer | MID VALLEY POWER | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO XL-G11S.3/BFG 595 | 621 | 595.3 W |
| inverter | Chint Power Systems America | CPS SCH100KTL-DO/US-480 [480V] [SI1-SB] | 3 | 100 kW |
Site risk
Severe-weather exposure
Solar sites in Stanislaus County have been matched to an average of 0 hail and 2.1 high-wind NOAA storm events.
Regional storm exposure by proximity (220 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125851290 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.