PGE-INT-125849287
Chowchilla · Madera County · California · Commercial
System size
66.2 kW
63.9 kW AC
Installed
2024
2024-06-24
Price / watt
$3.74/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Wholly Construction | All their sites → |
| Installer | Wholly Construction | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Silfab Solar Inc. | SIL-370BK | 194 | 371.1 W |
| inverter | Enphase Energy Inc. | IQ8H-3P-72-E-US [208V] [SI1-SB] | 194 | 0.38 kW |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125849287 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.