PGE-INT-125814891
Madera · Madera County · California · Commercial
System size
156.2 kW
152.3 kW AC
Installed
2024
2024-08-08
Price / watt
$3.13/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Utility | Southern California Edison Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS7N-655MB-AG | 256 | 655.3 W |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 3 | — |
Site risk
Severe-weather exposure
Solar sites in Madera County have been matched to an average of 1.1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (487 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125814891 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.