PanelCensus

PGE-INT-125808118

Marysville · Yuba County · California · Commercial

System size
49.6 kW
47.3 kW AC
Installed
2023
2023-12-14
Price / watt
$3.45/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperNORTH STATE SOLAR ENERGY CONSTRUCTIONAll their sites →
InstallerNORTH STATE SOLAR ENERGY CONSTRUCTIONAll their sites →
Utility / operatorPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterChilicon Power, LLCCP-250E-60/72-208/240-MC4 [208V][SI1-JUN20]300.29 kW
inverterChilicon Power, LLCCP-250E-60/72-208/240-MC4 [208V][SI1-JUN20]300.29 kW
inverterChilicon Power, LLCCP-250E-60/72-208/240-MC4 [208V] [SI1-FWVW]2480.29 kW
inverterChilicon Power, LLCCP-250E-60/72-208/240-MC4 [208V] [SI1-FWVW]2480.29 kW

Site risk

Severe-weather exposure

Solar sites in Yuba County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (58 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125808118 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125808118 — solar installation details | PanelCensus · PanelCensus