PanelCensus

PGE-INT-125807850

Atwater · Merced County · California · Commercial

System size
497.9 kW
490.1 kW AC
Installed
2024
2024-11-04
Price / watt
$2.03/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperMYNT SYSTEMS INCAll their sites →
InstallerMYNT SYSTEMS INCAll their sites →
Utility / operatorSoCore Energy LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleZNSHINE PV-TECH Co., Ltd.ZXM7-SHDB144-550/M965550.1 W
inverterSolarEdge Technologies Ltd.SE80KUS [480V] [SI1-SB]140.25 kW
inverterSolarEdge Technologies Ltd.SE120KUS [480V] [SI1-SB]240.25 kW
inverterSolarEdge Technologies Ltd.SE100KUS [480V][SI1-JUN20]133.3 kW

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.2782, -120.6332 · map

Record cadg_PGE-INT-125807850 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125807850 — solar installation details | PanelCensus · PanelCensus