PanelCensus

PGE-INT-125802893

Larkspur · Marin County · California · Commercial

System size
84.8 kW
83.5 kW AC
Installed
2024
2024-07-03
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerFIP CA 2023 VI, LLCAll their sites →
DeveloperB P IAll their sites →
InstallerB P IAll their sites →
Utility / operatorPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleZNSHINE PV-TECH Co., Ltd.ZXM7-SHLDD144-540/M168540.3 W
inverterSolarEdge Technologies Ltd.SE30KUS [480V][SI1-JUN20]330.16 kW

Site risk

Severe-weather exposure

Solar sites in Marin County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (1,214 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125802893 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

PGE-INT-125802893 — solar installation details | PanelCensus · PanelCensus