PanelCensus

PGE-INT-125775813

Templeton · San Luis Obispo County · California · Commercial

System size
100.8 kW
99.3 kW AC
Installed
2024
2024-01-10
Price / watt
$3.02/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperA.M. SUN SOLARAll their sites →
InstallerA.M. SUN SOLARAll their sites →
Utility / operatorEcos Energy LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHeliene144HC-530 M10 Bifacial202529.6 W
inverterYaskawa Solectria SolarPVI 60TL-480 [480V] [SI1-SB]260 kW

Site risk

Severe-weather exposure

Solar sites in San Luis Obispo County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (158 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 35.5570, -120.6828 · map

Record cadg_PGE-INT-125775813 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.

PGE-INT-125775813 — solar installation details | PanelCensus · PanelCensus