PGE-INT-125775638
San Ardo · Monterey County · California · Commercial
System size
34.5 kW
33.5 kW AC
Installed
2024
2024-07-26
Price / watt
$4.09/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | A.M. SUN SOLAR | All their sites → |
| Installer | A.M. SUN SOLAR | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Bluesun Solar Co.,Ltd | BSM550M10-72HBD | 68 | 550.6 W |
| inverter | Altenergy Power System Inc. | DS3 [240V][SI1-JUN20] | 34 | 0.9 kW |
Site risk
Severe-weather exposure
Solar sites in Monterey County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (406 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125775638 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.