PanelCensus

PGE-INT-125764410

Carmel · Monterey County · California · Commercial

System size
108.3 kW
107.3 kW AC
Installed
2024
2024-11-15
Price / watt
$3.80/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperBRIGHT FUTURE SOLAR ENERGYAll their sites →
InstallerBRIGHT FUTURE SOLAR ENERGYAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q CELLSQ.PEAK DUO XL-G10.3/BFG 490236489.8 W
inverterSolarEdge Technologies Ltd.SE10000H-US [240V] [SI1-SB]119.99 kW

Site risk

Severe-weather exposure

Solar sites in Monterey County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.

Regional storm exposure by proximity (406 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125764410 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125764410 — solar installation details | PanelCensus · PanelCensus