PGE-INT-125763537
Burlingame · San Mateo County · California · Commercial
System size
128 kW
126.1 kW AC
Installed
2025
2025-08-08
Price / watt
$0.02/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Sun Light & Power | All their sites → |
| Installer | Sun Light & Power | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Boviet Solar Technology Co., Ltd. | BVM7612M-540-H-HC-BF | 252 | 541 W |
| inverter | SolarEdge Technologies Ltd. | SE120KUS [480V] [SI1-JUN20] | 1 | 40.25 kW |
Site risk
Severe-weather exposure
Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.
Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125763537 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.