PGE-INT-125758636
San Jose · Santa Clara County · California · Commercial
System size
709.9 kW
699.5 kW AC
Installed
2025
2025-05-28
Price / watt
$4.28/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Sprig Electric | All their sites → |
| Installer | Sprig Electric | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Canadian Solar Inc. | CS3Y-490MB-AG | 1,378 | 490.6 W |
| module | Canadian Solar Inc. | CS3Y-485MB-AG | 174 | 485.7 W |
| inverter | Yaskawa Solectria Solar | PVI25TL-480-R [480V] [SI1-JUN20] | 1 | 25 kW |
| inverter | Yaskawa Solectria Solar | PVI 60TL-480 [480V] [SI1-SB] | 4 | 60 kW |
| inverter | Yaskawa Solectria Solar | PVI 50TL-480 [480V] [SI1-SB] | 9 | 50 kW |
Record cadg_PGE-INT-125758636 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.