PanelCensus

PGE-INT-125751488

Orland · Glenn County · California · Commercial

System size
505.7 kW
494.4 kW AC
Installed
2025
2025-02-04
Price / watt
$2.19/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
inverterSMA AmericaSB5000US (277V)2—
inverterSMA AmericaSTP 30-US-50 [480V] [SI1-SB]530 kW
inverterSMA AmericaSTP12000TL-US-10 (480V)312 kW
inverterSMA AmericaSB8000US (277V)12—
inverterSMA AmericaSTP 20-US-50 [480V] [SI1-SB]1120 kW
inverterSMA AmericaSTP 62-US-41 [480V] [SI1-SB]2—
inverterSMA AmericaSTP20000TL-US-10 (480V)420 kW
inverterSMA AmericaSTP20000TL-US-10 (480V)420 kW
inverterSMA AmericaSB8000US (277V)12—
inverterSMA AmericaSTP 62-US-41 [480V] [SI1-SB]2—
inverterSMA AmericaSTP 20-US-50 [480V] [SI1-SB]1120 kW
inverterSMA AmericaSTP 30-US-50 [480V] [SI1-SB]530 kW
inverterSMA AmericaSB5000US (277V)2—
inverterSMA AmericaSTP12000TL-US-10 (480V)312 kW

Site risk

Severe-weather exposure

Solar sites in Glenn County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (198 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 39.6995, -122.1779 · map

Record cadg_PGE-INT-125751488 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125751488 — solar installation details | PanelCensus · PanelCensus