PGE-INT-125744932
Parlier · Fresno County · California · Utility-scale
System size
1,011.9 kW
996.6 kW AC
Installed
2025
2025-08-04
Price / watt
$2.41/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Installer | PICKETT SOLAR CONSTRUCTION | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS7N-700TB-AG | 1,524 | 700.4 W |
| inverter | SMA America | SHP 125-US-21 [480V] [SI1-SB] | 8 | 125 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125744932 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.