PGE-INT-125715113
Sanger · Fresno County · California · Commercial
System size
580.6 kW
571.5 kW AC
Installed
2025
2025-02-26
Price / watt
$2.15/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BAP Power Corporation DBA Cenergy Power | All their sites → |
| Installer | BAP Power Corporation DBA Cenergy Power | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | JA Solar | JAM72D30-545/MB | 1,134 | 545.1 W |
| inverter | Yaskawa Solectria Solar | XGI 1500 175-480 [480V] [SI1-SB] | 3 | 175 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125715113 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Need California solar installation records in bulk? Filtered CSV export from 5,000 rows per download on Pro ($19/mo); Enterprise up to 100,000 rows.