PGE-INT-125689679
Monterey · Monterey County · California · Commercial
System size
109.4 kW
105.4 kW AC
Installed
2025
2025-04-16
Price / watt
$2.81/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | All their sites → |
| Installer | SCUDDER SOLAR ELECTRICAL ENERGY SYSTEMS | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Hanwha Q CELLS | Q.PEAK DUO XL-G10.3/BFG 480 | 243 | 479.7 W |
| inverter | Yaskawa Solectria Solar | PVI 25TL-208 [208V] [SI1-SB] | 4 | 25 kW |
Site risk
Severe-weather exposure
Solar sites in Monterey County have been matched to an average of 0 hail and 1 high-wind NOAA storm events.
Regional storm exposure by proximity (406 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125689679 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.