PGE-INT-125667726
Dos Palos · Merced County · California · Commercial
System size
119 kW
116.4 kW AC
Installed
2024
2024-05-15
Price / watt
$2.28/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BARRIER SOLAR INC | All their sites → |
| Installer | BARRIER SOLAR INC | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| inverter | SMA America | STP15000TL-US-10 (480V) | 2 | 15 kW |
| inverter | SMA America | STP24000TL-US-10 (480V) | 4 | 24 kW |
| inverter | SMA America | STP24000TL-US-10 (480V) | 4 | 24 kW |
| inverter | SMA America | STP15000TL-US-10 (480V) | 2 | 15 kW |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 1 | — |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125667726 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.