PGE-INT-125665564
Shafter · Kern County · California · Commercial
System size
56.3 kW
55.5 kW AC
Installed
2025
2025-03-04
Price / watt
$4.93/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | CALCOM SOLAR | All their sites → |
| Installer | CALCOM SOLAR | All their sites → |
| Utility | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | ZNSHINE PV-TECH Co., Ltd. | ZXM8-TPLDD132-660/M | 90 | 660.3 W |
| inverter | Chint Power Systems America | CPS SCA50KTL-DO/US-480 [480V] [SI1-SB] | 1 | 50 kW |
Site risk
Severe-weather exposure
Solar sites in Kern County have been matched to an average of 2.4 hail and 0 high-wind NOAA storm events.
Regional storm exposure by proximity (1,877 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125665564 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.