PanelCensus

PGE-INT-125615717

Snelling · Merced County · California · Commercial

System size
288 kW
281.9 kW AC
Installed
2024
2024-02-07
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerMid Valley PowerAll their sites →
DeveloperMid Valley PowerAll their sites →
InstallerMid Valley PowerAll their sites →
Utility / operatorPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q CELLSQ.PEAK DUO XL-G10.3/BFG 480640479.7 W
inverterSungrow Power Supply Co., Ltd.SG60CX-US [480V] [SI1-JUN20]460.18 kW

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125615717 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125615717 — solar installation details | PanelCensus · PanelCensus