PGE-INT-125608140
Fairfield · Solano County · California · Commercial
System size
161.2 kW
158.8 kW AC
Installed
2025
2025-05-15
Price / watt
$0.43/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | DANLIN CORPORATION | All their sites → |
| Installer | DANLIN CORPORATION | All their sites → |
| Utility / operator | San Diego Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | CSI Solar Co., Ltd. | CS6W-540MS | 318 | 540.2 W |
| inverter | SolarEdge Technologies Ltd. | SE33.3KUS [480V] [SI1-SB] | 1 | 33.3 kW |
| inverter | SolarEdge Technologies Ltd. | SE100KUS [480V][SI1-JUN20] | 1 | 33.3 kW |
Record cadg_PGE-INT-125608140 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.