PGE-INT-125561967
Fresno · Fresno County · California · Commercial
System size
35.5 kW
34.1 kW AC
Installed
2024
2024-10-02
Price / watt
$2.67/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Trinity Power | All their sites → |
| Installer | Trinity Solar | All their sites → |
| Utility | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | SunPower | SPR-A430-COM | 89 | 431.3 W |
| inverter | Altenergy Power System Inc. | QT2-208 [208V] [SI1-SB] | 23 | 1.73 kW |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125561967 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
More solar data for this area
Working with California solar installation records? Pro adds alerts, change history and CSV export ($149/mo); Enterprise adds full national files, the API and an MCP server for AI tools.