PGE-INT-125508638
Redwood City · San Mateo County · California · Commercial
System size
162 kW
159.6 kW AC
Installed
2024
2024-05-10
Price / watt
$2.92/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Sunworks | All their sites → |
| Installer | Sunworks | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Vietnam Sunergy Joint Stock Company | VSUN540-144BMH-DG | 324 | 540.8 W |
| inverter | Yaskawa Solectria Solar | PVI 60TL-480 [480V] [SI1-SB] | 2 | 60 kW |
Site risk
Severe-weather exposure
Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.
Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125508638 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.