PanelCensus

PGE-INT-125502380

Atwater · Merced County · California · Commercial

System size
59.9 kW
58.4 kW AC
Installed
2024
2024-05-21
Price / watt
$3.63/W
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
DeveloperBARRIER SOLAR INCAll their sites →
InstallerBARRIER SOLAR INCAll their sites →
Utility / operatorSoCore Energy LLCAll their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleCanadian Solar Inc.CS3W-445MB-AG145445.4 W
inverterSMA AmericaSTP 50-US-41 [480V] [SI1-SB]1—

Site risk

Severe-weather exposure

Solar sites in Merced County have been matched to an average of 1 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (90 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Location: 37.2782, -120.6332 · map

Record cadg_PGE-INT-125502380 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125502380 — solar installation details | PanelCensus · PanelCensus