PGE-INT-125371369
Fresno · Fresno County · California · Commercial
System size
195.8 kW
191 kW AC
Installed
2024
2024-04-05
Price / watt
$2.39/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | BARRIER SOLAR INC | All their sites → |
| Installer | BARRIER SOLAR INC | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Canadian Solar Inc. | CS3W-445MB-AG | 474 | 445.4 W |
| inverter | SMA America | STP 62-US-41 [480V] [SI1-SB] | 2 | — |
| inverter | SMA America | STP 50-US-41 [480V] [SI1-SB] | 1 | — |
Site risk
Severe-weather exposure
Solar sites in Fresno County have been matched to an average of 1 hail and 1.4 high-wind NOAA storm events.
Regional storm exposure by proximity (1,879 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.
Record cadg_PGE-INT-125371369 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.