PanelCensus

PGE-INT-125277559

San Carlos · San Mateo County · California · Commercial

System size
114.1 kW
111.2 kW AC
Installed
2024
2024-06-07
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerDistributed Solar Operations, LLCAll their sites →
DeveloperD S D CONSTRUCTIONAll their sites →
InstallerD S D CONSTRUCTIONAll their sites →
Utility / operatorSan Diego Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleJA SolarJAM72D30-540/MB225539.6 W
inverterSMA AmericaSTP 50-US-41 [480V] [SI1-SB]2—

Site risk

Severe-weather exposure

Solar sites in San Mateo County have been matched to an average of 0 hail and 3.1 high-wind NOAA storm events.

Regional storm exposure by proximity (438 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125277559 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125277559 — solar installation details | PanelCensus · PanelCensus