PGE-INT-125192897
Pleasanton · Alameda County · California · Commercial
System size
112.6 kW
109.1 kW AC
Installed
2024
2024-12-06
Price / watt
$2.71/W
pre-incentive
Ownership
Host-owned
Parties
Who's involved
| Role | Name | |
|---|---|---|
| Developer | Synergy Power | All their sites → |
| Installer | Synergy Power | All their sites → |
| Utility / operator | Pacific Gas & Electric Co. | All their sites → |
Names link to a party profile where one exists; “all their sites” lists every recorded installation.
Hardware
Equipment on this system
| Type | Manufacturer | Model | Qty | Spec |
|---|---|---|---|---|
| module | Panasonic Corporation of North America | EVPV380 | 311 | 380.2 W |
| inverter | SolarEdge Technologies Ltd. | SE43.2KUS [208V][SI1-JUN20] | 2 | 14.51 kW |
| inverter | SolarEdge Technologies Ltd. | SE17.3KUS [208V] [SI1-JUN20] | 1 | 16.56 kW |
Record cadg_PGE-INT-125192897 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.
Working with California solar installation records? Pro adds alerts, change history and CSV export ($19/mo); Enterprise adds full national files, the API and an MCP server for AI tools.