PanelCensus

PGE-INT-125092025

Rocklin · Placer County · California · Commercial

System size
47.3 kW
45.8 kW AC
Installed
2024
2024-07-09
Price / watt
—
pre-incentive
Ownership
Host-owned

Parties

Who's involved

RoleName
OwnerExcite 1, LLCAll their sites →
DeveloperEXCITE ENERGYAll their sites →
InstallerEXCITE ENERGYAll their sites →
UtilityPacific Gas & Electric Co.All their sites →

Names link to a party profile where one exists; “all their sites” lists every recorded installation.

Hardware

Equipment on this system

TypeManufacturerModelQtySpec
moduleHanwha Q CELLSQ.PEAK DUO XL-G10.d/BFG 480105479.7 W
inverterSolarEdge Technologies Ltd.SE50KUS [208V] [SI1-JUN20]116.56 kW

Site risk

Severe-weather exposure

Solar sites in Placer County have been matched to an average of 1.4 hail and 0 high-wind NOAA storm events.

Regional storm exposure by proximity (221 sites in this county) — an inspection/maintenance risk signal, not confirmed damage to this system.

Record cadg_PGE-INT-125092025 · compiled from LBNL Tracking the Sun + state programs + permit data. Coverage varies by jurisdiction.

More solar data for this area

Working with California solar installation records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

PGE-INT-125092025 — solar installation details · PanelCensus